Diesel generator sets the pre - boot inspection requirements - Foshan generator

Date:2016-09-24 09:41:42

1, the construction site of the rated voltage of diesel generators must be consistent with the external power supply voltage level.

2, fixed diesel generator set should be installed in the room on the basis of the provisions, and should be higher than the indoor ground 0.25 ~ 0.30m. Mobile diesel generating units should be in a level state, placed firmly, the trailer should be reliable grounding, live. Outdoor use of diesel generating sets should be erected protective shed.

3, Diesel generator set and its control, distribution, repair room, etc. should be set to ensure electrical safety distance and meet the fire safety requirements; exhaust pipe should be out of the room, and is strictly prohibited in the indoor and smoke storage barrels near the pipeline.

4, the construction site of the diesel generator set installation environment should be chosen near the load center, easy access to the surrounding roads and to avoid the pollution source of the downstream side and easy to place water.

5, the generator power supply must be linked with the external power supply line, is strictly prohibited with the external lines running side by side; when 2 and 2 units above the parallel operation, the synchronization device must be installed and synchronized to the load after the unit power supply.